Corner Cabinet Work Begins

Spent some time at the lumber yard picking the wood for this project.  Because I’m building two of these cabinets, there’s a lot of material to purchase, prep, and mill.  Since these pieces will be painted, the primary wood is poplar.  It mills nicely and is great with milk paint.

IMG_0529

The next steps are to cut material to size and make sure everything fits together properly.

IMG_0523 IMG_0524 IMG_0525

Then the first glue-up.  The main components of one of the base carbinets are assembled and glued together.  A piece likes this proves the adage that “you can never have too many clamps.”  Once clamped, there’s nothing more to do until the glue sets.

IMG_0526 IMG_0528

First glue-up of the first base cabinet is done.  Still much to do, but preliminary work on the second base cabinet will be next.

IMG_0531